Projects

Projects

Automated engine assembly line

Fast delivery:
6 months from contract signing to preliminary acceptance testing;
Less than 10 months from contract signing to final acceptance.


Machine features:
Flexible design, deep integration, and modular layout of the entire line.

Main equipment includes:
Pressing units, fastening stations, leak testing, rotary table, torque measurement, and more.


Technical specifications

Product model: AR18SE + AR18DE

Designed production capacity: 100,000 units per year

Production speed: 153 seconds per engine

Automation level: 68%

            

1111

Automatic cylinder head assembly line

Fast delivery:
5 months from contract signing to preliminary acceptance testing;
Less than 8 months from contract signing to final acceptance.


Machine features:
Flexible design, deep integration, and modular layout of the entire line.

Main equipment includes:
Pressing units, fastening stations, leak testing, rotary table, torque measurement, and more.


Technical specifications:

Product model: AR16DEg2 21122

Designed production capacity: 360,000 units per year

Production speed: 26 seconds per engine

Automation level: 75%

Please leave us a message

    I consent to the processing of my personal data (Federal Law No. 152-FZ) and accept the terms of the agreement *